EJS New York provided the Public School 35 renovation with an updated air conditioning solution. With 639 students in attendance, P.S. 35 needed a HVAC system quiet enough to not be a disturbance. To meet the needs, EJS equipped the renovation with 2 Innovent Air Handling Units and 1 Innovent Dedicated Outside Air Unit. The units will ensure the 5-story school building is well air conditioned, while also being cost-effective.
P.S. 35
Owner
New York School Construction Authority
Architect
Gruzen Samton, LLP
General Contractor
Citnalta
Mechanical Contractor
Grand Mechanical
MEP Engineer
Loring