The construction of Public School 342 was supplied with a new HVAC system. The construction of Public School 342 includes 20 classrooms, art and music rooms, a science suite, a library, a gymnasium, and a cafeteria that the new HVAC system will service. As basis of design, EJS New York equipped the state-of-the-art, 5-story school building with 3 Innovent Air Handling Units and 3 Innovent Dedicated Outside Air Units. The units will ensure Public School 342 has an air conditioning solution that is both cost-effective and quiet as to not disturb the 488 students.
P.S. 342
Owner
New York School Construction Authority
Architect
Dattner Architects
General Contractor
Tishman
Mechanical Contractor
KSW
MEP Engineer
DVL