EJS New York was selected as the basis of design for a new HVAC system for the South Ferry Terminal. As an underground station, the terminal suffered from water damage due to flooding during Hurricane Sandy. South Ferry Terminal was in need of a renovated high quality air conditioning system.
EJS equipped the terminal renovation with four Innovent Self-Contained Glycerol Cooled Platform Air Conditioning Units. Although the units were underground, we were able to easily work through the installation and functional testing process.